Basic
A quick check of the area and the obvious
- Floor area, laser-measured against the contract
- Visual check of the shell
- Not included: Full 100+ point checklist
- Not included: Moisture readings
- Not included: Electrics and sockets tested
- Not included: Thermal camera
- Not included: Video walkthrough
- Not included: Letter to the developer
- Not included: 1 re‑check after repairs
- Short report